Construction continues on the park. They brought in a big dump truck really early this morning. Soon after they started digging a trench at the end of the road. They dug and dug until they cut our Fios line, despite the fact that we pointed out where our line was several times. We were without phone, internet, and TV for 3 days. They called Verizon and a guy finally came out and connected a line from across the street, over the lawn, and to our house. It was a temporary fix. A little nerve racking to watch these big construction vehicles drive over this loose wire that ran across the street. It took them another two weeks to bury the line in a conduit.
A few days later they brought in tons of gravel to fill in where the road is going to be extended.